IMR OpenIR
Optimization and Scheduling of Byproduct Gas System in Steel Plant
Alternative TitleOptimization and Scheduling of Byproduct Gas System in Steel Plant
Yang Jinghui; Cai Jiuju; Sun Wenqiang; Liu Jingyu
2015
Source PublicationJOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL
ISSN1006-706X
Volume22Issue:5Pages:408-413
AbstractA mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7. 8% operation cost was reduced, compared with real data in iron and steel industry.
Other AbstractA mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7.8% operation cost was reduced, compared with real data in iron and steel industry.
KeywordMILP MODEL IRON-MAKING ENERGY PREDICTION INDUSTRY iron and steel industry byproduct gas energy saving optimization scheduling
Indexed ByCSCD
Language英语
Funding Project[Fundamental Research Funds for the Central Universities of China]
CSCD IDCSCD:5427974
Citation statistics
Cited Times:4[CSCD]   [CSCD Record]
Document Type期刊论文
Identifierhttp://ir.imr.ac.cn/handle/321006/142962
Collection中国科学院金属研究所
Affiliation中国科学院金属研究所
Recommended Citation
GB/T 7714
Yang Jinghui,Cai Jiuju,Sun Wenqiang,et al. Optimization and Scheduling of Byproduct Gas System in Steel Plant[J]. JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL,2015,22(5):408-413.
APA Yang Jinghui,Cai Jiuju,Sun Wenqiang,&Liu Jingyu.(2015).Optimization and Scheduling of Byproduct Gas System in Steel Plant.JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL,22(5),408-413.
MLA Yang Jinghui,et al."Optimization and Scheduling of Byproduct Gas System in Steel Plant".JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL 22.5(2015):408-413.
Files in This Item:
There are no files associated with this item.
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[Yang Jinghui]'s Articles
[Cai Jiuju]'s Articles
[Sun Wenqiang]'s Articles
Baidu academic
Similar articles in Baidu academic
[Yang Jinghui]'s Articles
[Cai Jiuju]'s Articles
[Sun Wenqiang]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Yang Jinghui]'s Articles
[Cai Jiuju]'s Articles
[Sun Wenqiang]'s Articles
Terms of Use
No data!
Social Bookmark/Share
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.