Open pit waste removal optimization through equipment fleet scheduling
其他题名Open pit waste removal optimization through equipment fleet scheduling
Gu Xiaowei1; Wang Qing1; Xu Xiaochuan1; Liu Jianping1; Sun Taiwei1; Du Kun1
2017
发表期刊TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA
ISSN1003-6326
卷号27期号:12页码:2682-2690
摘要A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines. An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain. Then, progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules. The objective is to minimize the present value of waste removal costs over the mine life. The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life: the selected equipment models, the number of equipment units of each model, the age of each unit, as well as the quantity of waste removed. A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.
其他摘要A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines. An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain. Then, progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules. The objective is to minimize the present value of waste removal costs over the mine life. The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life: the selected equipment models, the number of equipment units of each model, the age of each unit, as well as the quantity of waste removed. A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.
关键词MODEL SYSTEMS MINES open pit waste removal equipment fleet scheduling neighborhood search
收录类别CSCD
语种英语
资助项目[National Natural Science Foundation of China] ; [National Science Foundation for Young Scientists of China] ; [Liaoning Natural Science Founds, China] ; [Liaoning Province's Key Laboratory Construction, China] ; [Specialized Research Fund for the Doctoral Program of Higher Education of China] ; [Shenyang Technical Plan Project, China]
CSCD记录号CSCD:6148575
引用统计
文献类型期刊论文
条目标识符http://ir.imr.ac.cn/handle/321006/155751
专题中国科学院金属研究所
作者单位1.东北大学
2.中国科学院金属研究所
推荐引用方式
GB/T 7714
Gu Xiaowei,Wang Qing,Xu Xiaochuan,et al. Open pit waste removal optimization through equipment fleet scheduling[J]. TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA,2017,27(12):2682-2690.
APA Gu Xiaowei,Wang Qing,Xu Xiaochuan,Liu Jianping,Sun Taiwei,&Du Kun.(2017).Open pit waste removal optimization through equipment fleet scheduling.TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA,27(12),2682-2690.
MLA Gu Xiaowei,et al."Open pit waste removal optimization through equipment fleet scheduling".TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA 27.12(2017):2682-2690.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Gu Xiaowei]的文章
[Wang Qing]的文章
[Xu Xiaochuan]的文章
百度学术
百度学术中相似的文章
[Gu Xiaowei]的文章
[Wang Qing]的文章
[Xu Xiaochuan]的文章
必应学术
必应学术中相似的文章
[Gu Xiaowei]的文章
[Wang Qing]的文章
[Xu Xiaochuan]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。